Australia Model Code of Practice: Excavation Work
Section 5: Excavation methods – Australia Model Code of Practice: Excavation Work

Australia Model Code of Practice: Excavation Work 5.1b: 5.1 Support all sides of trenches at least 1.5 metres deep by shoring, benching or battering (WHS Regulation 306)

For a trench 1.5 metres or deeper, the PCBU must also minimise the risk of trench collapse to any person by making sure every side is adequately supported using one or more of: shoring by shielding or a comparable method; benching; or battering. A combination may work best depending on the environment and the material dug. In streets or built-up areas the excavation may need partial or full sheeting or support so local vehicle movement does not cause collapse. A competent person such as an engineer should be the one to design support systems or to help choose other collapse controls such as trench shields.

Maintained by Gerard Blokdyk

Other controls in Section 5: Excavation methods – Australia Model Code of Practice: Excavation Work

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.