Section 5: WHS management plans for construction projects – Australia Model Code of Practice: Construction Work

Australia Model Code of Practice: Construction Work 5.2: 5.1 and 5.2 Prepare a written WHS management plan before the project starts, with the required content (r 309)

The principal contractor must prepare a written WHS management plan for the workplace before work on a construction project starts (r 309), easily understood by workers, contractors and subcontractors. It must contain: the names, positions and health and safety responsibilities of people whose roles carry specific WHS responsibilities (such as site supervisors, project managers, first aid officers); the arrangements for consultation, cooperation and coordination between PCBUs; the arrangements for managing WHS incidents; site-specific health and safety rules and how people will be told about them; and the arrangements for collecting, assessing, monitoring and reviewing SWMS. It may also cover the hazardous chemicals register, SDS and storage, plant use and storage, a traffic management plan, essential services information, security and public safety, licences and training, and identified psychosocial hazards and controls.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 45001:2018 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 5: WHS management plans for construction projects – Australia Model Code of Practice: Construction Work

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.