Australia Model Code of Practice: Construction Work 5.3: 5.3 Generic WHS management plans reviewed for each project

A principal contractor may prepare a generic WHS management plan usable on several projects, but must review it for the hazards and risks of each specific project and workplace and revise it as necessary. Appendix G advises on content: listing people with responsibilities (HSRs only if they have a separate coordinating role), consultation arrangements (pre-commencement meetings, regular contractor meetings, toolbox meetings, a project WHS committee, a newsletter, and arrangements for people off site), incident management (stabilising and evacuating the injured safely, isolating and preserving the scene, making it safe, notifying the principal contractor, regulator and emergency services, investigating), emergency situations (the emergency plan, its testing, training), first aid, near miss reporting, SWMS collection with checks that controls do not conflict across contractors, and simple clear site rules communicated by toolbox talks, posting and handing out copies, with arrangements for workers with limited English.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 45001:2018 · 1 control

  • 10.2 Incident, nonconformity and corrective action

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 5: WHS management plans for construction projects – Australia Model Code of Practice: Construction Work

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.