Australia Model Code of Practice: Construction Work
Section 5: WHS management plans for construction projects – Australia Model Code of Practice: Construction Work

Australia Model Code of Practice: Construction Work 5.5: 5.5 Review the plan to keep it current and tell people of revisions (r 311)

The principal contractor must review and as necessary revise the WHS management plan to keep it up to date (r 311), for example after significant changes to site conditions, site rules or responsible people, and when it is revised must ensure, so far as reasonably practicable, that everyone carrying out construction work on the project is made aware of the revision.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 45001:2018 · 1 control

  • 7.5.2 Creating and updating

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 5: WHS management plans for construction projects – Australia Model Code of Practice: Construction Work

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.