Assessing risk considers the severity of possible injury or illness and its likelihood, including the number of people exposed. The WHS Regulations do not expressly require a risk assessment for construction work, but in many cases it helps identify who is exposed, what causes the risk, what controls are needed and whether existing ones work; it is not needed where the risk and its control are already known. SWMS for high risk construction work are dealt with separately.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 45001:2018 · 1 control

  • 6.1.2.2 Assessment of OH&S risks and other risks to the OH&S MS

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 3: The risk management process – Australia Model Code of Practice: Construction Work

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.