A combination of controls is often needed; when selecting one, consider whether it introduces new risks and review the combination if so. The code's examples: demolishing old roofing from the ground if possible, otherwise from scissor lifts or EWPs, backed by site rules and a SWMS; and for mobile plant, traffic lights instead of a traffic controller, plant with clear vision or zero tail swing, separating work by distance and time, collision avoidance technology, a traffic management plan and high visibility clothing.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.