Australia Heavy Vehicle National Law Safety Management System Standard 2026
Schedule 3 Alternative compliance accreditation, mass (requirements 2 to 9) – Australia Heavy Vehicle National Law Safety Management System Standard 2026

Australia Heavy Vehicle National Law Safety Management System Standard 2026 S3-4: ACA mass, vehicle use: mass determined before departure by a method giving objective assurance of compliance with axle and gross mass limits, loading decisions based on defined repeatable methods rather than estimates, foreseeable variation in density, volume, quantity and distribution accounted for, no trip commencing until compliance is confirmed, and records of suspension-related regulatory non-conformance

What does S3-4 require?

Vehicle mass is established before every departure in a way that reliably confirms compliance with the applicable axle and gross mass limits, through an objective approach to loading rather than estimates, assumptions or informal habit. Before a loaded vehicle or combination sets off, its mass is either measured directly or assessed by a method giving equivalent assurance; the system allows for foreseeable variation in the load (density, volume, quantity, distribution) so that such variation cannot produce an exceedance, and compliance is controlled at the point where the risk is created, before departure, rather than discovered afterwards, through loading practices that are structured, repeatable and able to demonstrate that limits are not exceeded in normal operation. Five things are looked for: mass is determined before departure by a method giving objective assurance of compliance with axle and gross mass limits; loading decisions follow defined, repeatable methods rather than estimates or informal judgement; the method allows for foreseeable variation in load density, volume, quantity or distribution; vehicles do not start a trip until mass compliance is confirmed; and enough records of regulatory non-conformance concerning vehicle suspension are kept to identify, review and manage suspension-related mass risk.

Maintained by Gerard Blokdyk

Other controls in Schedule 3 Alternative compliance accreditation, mass (requirements 2 to 9) – Australia Heavy Vehicle National Law Safety Management System Standard 2026

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.