Once equipment is on hire, the hiree becomes responsible for inspecting, testing and tagging it, and it fixes the retest interval by reading Table 2.4 against an assessment of the conditions where the item is used.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.