New equipment enters the hire fleet in the same way as other new equipment under 1.2.1. At the start of each hire the hirer is responsible for the hired item complying with this standard. Hirers may combine the standard's test tag with their own ready-for-hire tag.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.