Changeover devices must be rated for at least the largest out-of-phase voltage that can appear across contacts tied to the two sources, and for the highest load current and fault duty available on either the normal or the generator supply.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.