The electrical installation must meet AS/NZS 3000 and the extra requirements of this Standard. With several sets, each may have its own generator switchboard or a group may share one holding controls, changeover devices, synchronising controls and switchgear.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.