AS/NZS 3010:2017 Electrical Installations Generating Sets
Section 2: General requirements for the installation of generating sets – AS/NZS 3010:2017 Electrical Installations Generating Sets

AS/NZS 3010:2017 Electrical Installations Generating Sets 2.5(f)-(g): 2.5 Earthing arrangements (f) and (g): changeover preserves installation functions; NZ main switchboard connection

The changeover device must be chosen to keep the functions of, and avoid damage to, the installation it supplies (for example overlapping neutrals, RCD operation, continued UPS operation). In New Zealand a set supplying an installation must connect only to the main switchboard, unless it connects to a distribution switchboard and ceases supply when that board's supply is interrupted, and other sources are disconnected, a MEN arrangement is established and earth potential rise protection is provided.

Maintained by Gerard Blokdyk

Other controls in Section 2: General requirements for the installation of generating sets – AS/NZS 3010:2017 Electrical Installations Generating Sets

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.