AS/NZS 3010:2017 Electrical Installations Generating Sets
Section 2: General requirements for the installation of generating sets – AS/NZS 3010:2017 Electrical Installations Generating Sets

AS/NZS 3010:2017 Electrical Installations Generating Sets 2.4.2.1: 2.4.2.1 Operation of the prime mover isolating device

When switched to off or isolated, the device must block any start of the engine from automatic controls or remote switches. Where the isolation is done by a switch in the control or start circuit, that switch must break every live conductor of the circuit. Isolation may not rely on electronic devices.

Maintained by Gerard Blokdyk

Other controls in Section 2: General requirements for the installation of generating sets – AS/NZS 3010:2017 Electrical Installations Generating Sets

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.