A visual inspection of the membrane is required before any overlaying finish is installed, to confirm its integrity. The note lists what to look for: continuity, pinholes, dry film thickness, fillets, transitions, bonding, vertical termination heights and waterstop location and adequacy.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.