The substrate's moisture content must be measured before membrane application and must be suitable for the membrane system to be used. Notes point to product specifications, moisture barriers as a mitigation, and Appendix F for test methods.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.