AS 3740:2021 Waterproofing of Domestic Wet Areas
Section 4: Installation - substrates, drainage connections and membranes – AS 3740:2021 Waterproofing of Domestic Wet Areas

AS 3740:2021 Waterproofing of Domestic Wet Areas 4.5.2: 4.5.2 Curing of membranes

Every membrane must reach overlay stage before any overlaying finish is applied, and must reach full cure before a flood test or any other exposure to moisture. Notes list the factors that govern curing time, including chemistry, solids content, site conditions, ventilation, coat thickness and substrate condition.

Maintained by Gerard Blokdyk

Other controls in Section 4: Installation - substrates, drainage connections and membranes – AS 3740:2021 Waterproofing of Domestic Wet Areas

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.