Every membrane must reach overlay stage before any overlaying finish is applied, and must reach full cure before a flood test or any other exposure to moisture. Notes list the factors that govern curing time, including chemistry, solids content, site conditions, ventilation, coat thickness and substrate condition.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.