Permanent bracing lets the roof, walls and floor resist racking forces, with connections carrying those forces to the foundations; bracing is designed for each storey. Temporary bracing during construction must equal at least 60 % of the permanent bracing required and may form part of it.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.