ISO 22301:2019NIST SP 800-53 Rev 5

ISO 22301:2019 covers 7.3% of NIST SP 800-53 Rev 5

22 of the 300 controls in NIST SP 800-53 Rev 5 are already satisfied by evidence you collected for ISO 22301:2019. 278 are genuine gaps. Every claim below was judged against both control sets and then argued against; the ones that did not survive are published further down with the reason each failed.

7.3%
of the target already covered
22
controls evidenced
278
genuine gaps
147
claims rejected in review

This number is directional. It says how much of NIST SP 800-53 Rev 5 your ISO 22301:2019 evidence satisfies. The reverse pair is a different number, often very different, because a security standard has enormous depth for access control and almost none for lawful basis or data subject rights.

193 candidate mappings were examined and 147 were removed. Signed off 2026-08-19, review level machine verified. Mappings were judged by Claude Code rather than read line by line by a practitioner. Every claim shows its reasoning so you can check it. Ask and a practitioner will review this pair.

Where the gaps are

Coverage is never evenly spread. A source standard usually satisfies one part of a target almost completely and barely touches another, and which part is which is the thing worth knowing before you plan the work.

IR - Incident Response5 of 9 evidenced, 4 to do
CP - Contingency Planning5 of 12 evidenced, 7 to do
AT - Awareness and Training2 of 5 evidenced, 3 to do
CA - Assessment, Authorization, and Monitoring3 of 8 evidenced, 5 to do
RA - Risk Assessment3 of 9 evidenced, 6 to do
PM - Program Management4 of 32 evidenced, 28 to do
AC - Access Control0 of 23 evidenced, 23 to do
AU - Audit and Accountability0 of 15 evidenced, 15 to do
CM - Configuration Management0 of 14 evidenced, 14 to do
IA - Identification and Authentication0 of 13 evidenced, 13 to do
MA - Maintenance0 of 7 evidenced, 7 to do
MP - Media Protection0 of 8 evidenced, 8 to do
PE - Physical and Environmental Protection0 of 22 evidenced, 22 to do
PL - Planning0 of 8 evidenced, 8 to do
PS - Personnel Security0 of 9 evidenced, 9 to do
PT - PII Processing and Transparency0 of 8 evidenced, 8 to do
SA - System and Services Acquisition0 of 17 evidenced, 17 to do
SC - System and Communications Protection0 of 47 evidenced, 47 to do
SI - System and Information Integrity0 of 22 evidenced, 22 to do
SR - Supply Chain Risk Management0 of 12 evidenced, 12 to do

Theme level, not control level, deliberately. The per-control list of what is evidenced and what is a gap is the report itself, so publishing it here would be publishing the thing being sold.

Claims that held

A sample. Each one names the control whose evidence does the work, the control it satisfies, and why.

7.3NIST800-AT-2argued against and upheld
Literacy training and awareness

Awareness requirements ensure personnel know the policy and their contribution.

7.2NIST800-AT-3argued against and upheld
Role-based training

Competence is determined and provided for each defined role.

9.2NIST800-CA-2argued against and upheld
Control assessments

Internal audit at planned intervals with an audit programme and reported results.

10.1NIST800-CA-5argued against and upheld
Plan of action and milestones

Nonconformity handling with documented actions and results is the evidence a plan of action and milestones records.

9.1NIST800-CA-7argued against and upheld
Continuous monitoring

Monitoring, measurement, analysis and evaluation runs at planned intervals with defined methods.

5.2.1NIST800-CP-1argued against and upheld
Policy and procedures for contingency planning

A documented, approved continuity policy is the contingency planning policy evidence.

8.4.5NIST800-CP-10argued against and upheld
System recovery and reconstitution

Recovery procedures restore activities from temporary measures to normal operation.

8.4.4NIST800-CP-2argued against and upheld
Contingency plan

Documented continuity plans carry activation, roles, recovery steps and contacts.

Claims that did not hold

147 proposed mappings for this pair were rejected. They are kept in the graph rather than deleted, so what was thrown out is as inspectable as what survived. A crosswalk that never rejects anything is not being judged.

7.5.3NIST800-AT-4
Training records

Held back 2026-08-19. Generated by the retired metered path, refuted at 56 percent wherever re-judged. Pair pulled from sale pending a rebuild on the Max plan.

Claimed at high confidence before it was rejected.

10.2NIST800-CA-5
Plan of action and milestones

target corrected: ISO 22301 clauses 10.1 and 10.2 were swapped in the graph

Claimed at high confidence before it was rejected.

8.4.4NIST800-CP-1
Policy and procedures for contingency planning

Held back 2026-08-19. Generated by the retired metered path, refuted at 56 percent wherever re-judged. Pair pulled from sale pending a rebuild on the Max plan.

Claimed at high confidence before it was rejected.

8.4.3NIST800-CP-11
Alternate Communications Protocols. Provide the capability to employ [organization-defined] in support of maintaining continuity of operations

Held back 2026-08-19. Generated by the retired metered path, refuted at 56 percent wherever re-judged. Pair pulled from sale pending a rebuild on the Max plan.

Claimed at high confidence before it was rejected.

8.5NIST800-CP-3
Contingency training

Held back 2026-08-19. Generated by the retired metered path, refuted at 56 percent wherever re-judged. Pair pulled from sale pending a rebuild on the Max plan.

Claimed at high confidence before it was rejected.

8.4.4NIST800-CP-7
Alternate processing site

retired metered-API path. 56 percent of its output was refuted wherever it was re-judged, so its residue is not trusted evidence. Superseded by judgement on the Claude Max plan 2026-08-19.

Claimed at medium confidence before it was rejected.

8.3.2NIST800-CP-7
Alternate processing site

Held back 2026-08-19. Generated by the retired metered path, refuted at 56 percent wherever re-judged. Pair pulled from sale pending a rebuild on the Max plan.

Claimed at high confidence before it was rejected.

8.5NIST800-CP-7
Alternate processing site

retired metered-API path. 56 percent of its output was refuted wherever it was re-judged, so its residue is not trusted evidence. Superseded by judgement on the Claude Max plan 2026-08-19.

Claimed at medium confidence before it was rejected.

The full report

Everything above is a sample. The report is every evidenced control and every gap, with the reasoning and the source document behind each one, in a form you can hand to an assessor. $299, emailed immediately.

Buy this crosswalk