APRA CPS 234NIST SP 800-53 Rev 5

APRA CPS 234 covers 8% of NIST SP 800-53 Rev 5

24 of the 300 controls in NIST SP 800-53 Rev 5 are already satisfied by evidence you collected for APRA CPS 234. 276 are genuine gaps. Every claim below was judged against both control sets and then argued against; the ones that did not survive are published further down with the reason each failed.

8%
of the target already covered
24
controls evidenced
276
genuine gaps
0
claims rejected in review

What this leaves you to do

NIST SP 800-53 Rev 5 has 300 controls. Holding APRA CPS 234 already evidences 24 of them, so the work in front of you is 276 controls, not 300, which is 92% of the standard rather than all of it.

That is the whole claim. We do not know your hourly rate, how long a control takes you, or how many people you have, so there is no figure here in dollars or weeks. Every number in that sentence comes from the two counts above it and can be re-derived from the free tools without taking our word for any of it.

This number is directional. It says how much of NIST SP 800-53 Rev 5 your APRA CPS 234 evidence satisfies. The reverse pair is a different number, often very different, because a security standard has enormous depth for access control and almost none for lawful basis or data subject rights.

49 candidate mappings were examined and 0 were removed. Signed off 2026-08-19, review level machine verified. Mappings were judged by Claude Code rather than read line by line by a practitioner. Every claim shows its reasoning so you can check it. Ask and a practitioner will review this pair.

Where the gaps are

Coverage is never evenly spread. A source standard usually satisfies one part of a target almost completely and barely touches another, and which part is which is the thing worth knowing before you plan the work.

IR - Incident Response5 of 9 evidenced, 4 to do
CA - Assessment, Authorization, and Monitoring3 of 8 evidenced, 5 to do
SR - Supply Chain Risk Management4 of 12 evidenced, 8 to do
RA - Risk Assessment3 of 9 evidenced, 6 to do
PM - Program Management6 of 32 evidenced, 26 to do
PS - Personnel Security1 of 9 evidenced, 8 to do
SA - System and Services Acquisition1 of 17 evidenced, 16 to do
SI - System and Information Integrity1 of 22 evidenced, 21 to do
AC - Access Control0 of 23 evidenced, 23 to do
AT - Awareness and Training0 of 5 evidenced, 5 to do
AU - Audit and Accountability0 of 15 evidenced, 15 to do
CM - Configuration Management0 of 14 evidenced, 14 to do
CP - Contingency Planning0 of 12 evidenced, 12 to do
IA - Identification and Authentication0 of 13 evidenced, 13 to do
MA - Maintenance0 of 7 evidenced, 7 to do
MP - Media Protection0 of 8 evidenced, 8 to do
PE - Physical and Environmental Protection0 of 22 evidenced, 22 to do
PL - Planning0 of 8 evidenced, 8 to do
PT - PII Processing and Transparency0 of 8 evidenced, 8 to do
SC - System and Communications Protection0 of 47 evidenced, 47 to do

Theme level, not control level, deliberately. The per-control list of what is evidenced and what is a gap is the report itself, so publishing it here would be publishing the thing being sold.

Claims that held

A sample. Each one names the control whose evidence does the work, the control it satisfies, and why.

CPS 234 para 27NIST800-CA-2argued against and upheld
Control assessments

Control effectiveness must be assessed through a systematic programme with defined scope and frequency.

CPS 234 para 30NIST800-CA-2argued against and upheld
Control assessments

Assessors must be skilled specialists functionally independent of the activity being tested.

CPS 234 para 32NIST800-CA-2argued against and upheld
Control assessments

Internal audit must review design and operating effectiveness of information security controls.

CPS 234 para 29NIST800-CA-5argued against and upheld
Plan of action and milestones

Deficiencies that cannot be remediated in a timely way must be recorded and escalated.

CPS 234 para 27NIST800-CA-7argued against and upheld
Continuous monitoring

Ongoing control effectiveness testing at a frequency reflecting change is continuous monitoring.

CPS 234 para 26NIST800-IR-3argued against and upheld
Incident response testing

Response plans must be reviewed and tested annually to confirm they remain effective.

CPS 234 para 25NIST800-IR-4argued against and upheld
Incident handling

Plans must cover every incident stage from detection through to post incident review.

CPS 234 para 23NIST800-IR-4argued against and upheld
Incident handling

Robust mechanisms must detect incidents and respond to them in a timely way.

Claims that did not hold

Nothing proposed for this pair was rejected in review. That is unusual and worth knowing rather than hiding: it means the candidate set was small and every candidate held.

The full report

Everything above is a sample. The report is every evidenced control and every gap, with the reasoning and the source document behind each one, in a form you can hand to an assessor. $299, emailed immediately.

Buy this crosswalk