Victoria Occupational Health and Safety Regulations 2017
Part 5.1: Construction – Victoria Occupational Health and Safety Regulations 2017

Victoria Occupational Health and Safety Regulations 2017 r355-1: r 355(1) Notify the Authority at least 3 days before construction excavation work

Any employer, and any self-employed person, planning construction excavation of a shaft, a trench or a tunnel must notify the Authority, in the form required by r 355(2), no less than 3 days before the work starts. Maximum penalty: 60 units (individual), 300 units (company).

Maintained by Gerard Blokdyk

Other controls in Part 5.1: Construction – Victoria Occupational Health and Safety Regulations 2017

Query this from an agent