Any employer, and any self-employed person, planning construction excavation of a shaft, a trench or a tunnel must notify the Authority, in the form required by r 355(2), no less than 3 days before the work starts. Maximum penalty: 60 units (individual), 300 units (company).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.