UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 4 General requirements for construction sites – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

UK Construction (Design and Management) Regulations 2015 (CDM 2015) 31: Emergency routes and exits

What does 31 require?

Sufficient suitable emergency routes and exits lead as directly as possible to an identified safe area, are kept clear, lit where necessary and signed.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 4 General requirements for construction sites – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.