All practicable steps prevent collapse of new or existing structures that may become unstable or temporarily weak because of the work; temporary supports and structures are designed, installed and maintained for foreseeable loads and used only as designed; structures are not overloaded.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.