UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 4 General requirements for construction sites – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

UK Construction (Design and Management) Regulations 2015 (CDM 2015) 22: Excavations

What does 22 require?

All practicable steps, including support or battering, prevent collapse, dislodged material and burial; people, equipment and materials are prevented from falling in and edges from overloading; supported excavations are inspected by a competent person at the start of each shift and after events affecting stability or falls of material, and work stops until defects are remedied.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 4 General requirements for construction sites – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.