UK Construction (Design and Management) Regulations 2015 (CDM 2015) 25: Energy distribution installations

What does 25 require?

Energy installations are located, checked and marked where needed to prevent danger; overhead power lines are diverted or isolated, or else warned and protected by barriers, suspended protection or equivalent measures; work that could create risk from underground services proceeds only after suitable steps prevent it.