SWIFT CSCF
IR

SWIFT CSCF SWIFTCSCF-7: Plan Incident Response (Objective 7)

Per SWIFT CSCF Objective 7: Cyber Incident Response Planning + Security Training and Awareness + Penetration Testing + Scenario Risk Assessment + cooperate with SWIFT ISAC.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 17 controls across 9 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • GGAP-IFA-AllFarmBase-Mgmt-Workers-Env-Trace GLOBALG.A.P. IFA v6 All Farm Base (AF): Management, Workers, Environment, Traceability and Food Safety
  • GGAP-IFA-CropsBase-Production-PPP-IPM GLOBALG.A.P. IFA v6 Crops Base (CB): Propagation, Soil, Water, IPM, PPP, Fertilizer and Harvest

PCI DSS 4.0 · 2 controls

  • 2.1.1 2.1.1 Requirement 2 policies and procedures governed
  • 2.1.2 2.1.2 Requirement 2 roles and responsibilities assigned
  • PICSGMP-3 Chapter 3: Premises and Equipment - Design, Qualification, Calibration
  • PICSGMP-4 Chapter 4: Documentation - System, Record-Keeping, Data Integrity
  • 58.49 Laboratory Operation Areas
  • FSSC-Additional-Requirements-v6 FSSC 22000 Additional Requirements v6 (Food Defense + Food Fraud + Allergen + Environmental + Culture)
  • 2.1.3 Food Safety and Quality Culture

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Query this from an agent

The graph holds this control, the 17 it maps to, and the evidence behind each claim, over MCP and REST.