On completion the independent body assembles the audit results into a written report. The report, together with other relevant documentation, is delivered to the supervisory authority in the way the authority has specified. The general advice says the report should contain any vulnerabilities identified, other information that came to light during the audit, and proposed measures.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.