NIST SP 800-88 Rev 2
Section 4: the media sanitization programme (policy, scope, decision framework, performance, assurance, documentation, roles) – NIST SP 800-88 Rev 2

NIST SP 800-88 Rev 2 4.5.1: Verify the outcome: inspect destruction remnants and equipment; for logical techniques check tool completion status, errors, anomalies and media health; for physical purge confirm the equipment completed; elaborate sampling is unnecessary unless policy requires it

What does 4.5.1 require?

Verification determines the outcome of the technique used: the results are inspected to confirm the technique completed successfully. For destructive methods on hard copy or ISM, the remnants are inspected and the equipment used identified. For non-destructive methods verification depends on the media type: clear and logical purge techniques using tools and systems are verified by checking the tools' completion status and looking for errors and anomalies and checking the ISM's health; for physical purge techniques the equipment is checked to confirm it completed its operation, with the ISM possibly unusable until device software and configuration are re-established, which limits further inspection. Unless organisational policy explicitly requires it, elaborate full or representative sampling of ISM contents after clear or purge is not necessary.

Maintained by Gerard Blokdyk

Other controls in Section 4: the media sanitization programme (policy, scope, decision framework, performance, assurance, documentation, roles) – NIST SP 800-88 Rev 2

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.