Identify and supply the resources required to set up, run, maintain and keep improving both energy performance and the EnMS.
This control maps to 10 controls across 9 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 10 it maps to, and the evidence behind each claim, over MCP and REST.