The analysed change request is evaluated and a decision to accept or reject it taken by the responsible persons with the rationale documented. This sits in clause 8, whose stated aim is that every change to safety-related work products, items or elements is analysed and kept under control over the whole lifecycle. Requirement text not held.
This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.