In setting duration the body considers the applicable standards and scheme rules; the Table A.1 categories (using the highest basic duration when several apply); complexity of activities and the FSMS; hazards of the products, processes and services; the regulatory context; outsourcing; FSMS maturity, audit type and prior results; site size, infrastructure, number and location of sites and seasonality; multi-site aspects; combined, joint or integrated audits; delivery method including ICT; degree of central control; automation, closed systems and labour intensity; and language or interpretation needs.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.