ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.7.1: 5.7.1 Submit information model for appointing party acceptance

What does 3:5.7.1 require?

On Figure 4 branches M or P, the lead appointed party submits the delivery team's model through the CDE for acceptance; on branch N, the appointing party instead receives the model from whichever other appointing party or asset owner holds it.

Maintained by Gerard BlokdykControl text last updated

Other controls in ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.