ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.6.3: 5.6.3 Undertake quality assurance check

What does 3:5.6.3 require?

Each task team checks every container for compliance with the production methods and procedures, plus the asset information standard. If a container passes, it is marked as checked and the result is recorded; if it fails, it is rejected and the author is told the outcome and what must be corrected. The CDE can automate some checks; this check does not assess accuracy or fitness and does not take the place of review and approval (5.6.4).

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.7 Control of nonconforming outputs

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.