Each task team checks every container for compliance with the production methods and procedures, plus the asset information standard. If a container passes, it is marked as checked and the result is recorded; if it fails, it is rejected and the author is told the outcome and what must be corrected. The CDE can automate some checks; this check does not assess accuracy or fitness and does not take the place of review and approval (5.6.4).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.