ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.6.2: 5.6.2 Generate information

What does 3:5.6.2 require?

Each task team produces information as work in progress in line with its TIDP. The information conforms to the asset information standard and to the production methods and procedures; it does not go beyond the required level of information need, stray outside the part of the container breakdown structure allocated to the team, or duplicate information from other task teams; and it is coordinated and cross-referenced with information shared in the CDE at a suitable suitability. The task teams involved settle coordination issues together or, if they cannot, refer them to the lead appointed party.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.5.1 Control of production and service provision

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.