ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.4.2: 5.4.2 Establish the delivery team's detailed responsibility matrix

What does 3:5.4.2 require?

The lead appointed party draws up a detailed responsibility matrix that confirms which information is produced, when, with whom it is exchanged, and which task team produces it. It considers the delivery milestones, capability and capacity across the team, the asset production methods and procedures, which parts of the container breakdown structure each task team has been given, and production dependencies between task teams.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 10007:2017 · 1 control

  • 4.1 Responsibilities and authorities

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.