Monitoring and measurement processes provide the objective evidence of conformity; customers sometimes request inspection and test plans alone. The plan should define the process and product monitoring and measurements, the stages at which they apply, the characteristics measured at each stage, the procedures and acceptance criteria, any statistical process control procedures, where inspections or tests are witnessed or performed by regulatory authorities or customers (type tests, testing on site, acceptance testing included, and verifying and validating the product), where, when and how third parties will perform inspections or tests, and the criteria for product release. The plan should identify the controls for monitoring and measuring equipment used on the case including its calibration confirmation status (ISO 10012; ISO/TR 10017 for statistical methods).
This control maps to 8 controls across 6 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 8 it maps to, and the evidence behind each claim, over MCP and REST.