Where products need identifying, the plan should set out how; where traceability is required, how far it extends, including how affected products are identified. The plan should say how traceability requirements arising from contracts, statutes and regulations are picked up and built into working documents, which traceability records are produced and how they are controlled and distributed, and what is required, and how, to identify inspection and test status (ISO 10007 for configuration management).