The plan should say what is required for storing, handling, packing and delivering the product and how those requirements are met, and, where delivery is the organization's responsibility, how the product reaches the specified site with its required characteristics intact.
This control maps to 3 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.