ILO-OSH 2001 Guidelines on Occupational Safety and Health Management Systems
Chapter 3 Evaluation: performance monitoring, investigation, audit, management review (3.11 to 3.14) – ILO-OSH 2001 Guidelines on Occupational Safety and Health Management Systems

ILO-OSH 2001 Guidelines on Occupational Safety and Health Management Systems 3.11.6-3.11.7: Active monitoring of plans, performance criteria and objectives, systematic inspection of work systems, premises, plant and equipment, surveillance of the working environment including work organisation, health surveillance for early detection of harm, and compliance with legal and subscribed commitments; reactive monitoring that identifies, reports and investigates injuries, ill health including sickness absence, diseases and incidents, other losses such as property damage, deficient performance and system failures, and rehabilitation and health-restoration programmes

What does 3.11.6-3.11.7 require?

Active monitoring, the proactive side, tracks delivery of specific plans, performance criteria and objectives; inspects work systems, premises, plant and equipment systematically; keeps the working environment, work organisation included, under surveillance; where appropriate keeps workers' health under surveillance through suitable medical monitoring or follow-up so that early signs of harm are caught and the effectiveness of prevention and control judged; and checks compliance with applicable law, collective agreements and other OSH commitments. Reactive monitoring covers the identification, reporting and investigation of work-related harm and incidents (with aggregate sickness absence records watched), of other losses such as property damage, of poor safety and health performance and system failures, and of workers' rehabilitation and health-restoration programmes.

Maintained by Gerard Blokdyk

Other controls in Chapter 3 Evaluation: performance monitoring, investigation, audit, management review (3.11 to 3.14) – ILO-OSH 2001 Guidelines on Occupational Safety and Health Management Systems

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.