IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems 3-A.6: Part 3, Annex A Table A.6 Programmable electronics integration techniques

For hardware and software integration the table lists functional and black-box testing (HR at every SIL), performance testing, and forward traceability from the hardware/software integration requirements (system and software design) to the integration test specs (R at SIL 1 and 2, HR at SIL 3 and 4).

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A.6 Table A.6: software integration analysis and testing (7.3 and 7.6)
  • 4:7.4.2 7.4.2 Hardware-software integration and testing

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Part 3, Normative annexes A and D – IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.