IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems
Part 3, Normative annexes A and D – IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems

IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems 3-A.5: Part 3, Annex A Table A.5 Software module testing and integration techniques

For module and integration testing the table lists probabilistic testing, dynamic analysis and testing, data recording and analysis, functional and black-box testing (HR at every SIL), performance testing, model-based testing, interface testing, test management and automation tools, forward traceability from the software design spec to the module and integration tests (R at SIL 1 and 2, HR at SIL 3 and 4), and formal verification, which may reduce the testing needed.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A.5 Table A.5: software component analysis and testing (6.2 and 7.4)
  • 6:9.4 9.4 Software unit verification

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Part 3, Normative annexes A and D – IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.