IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems
Part 1, Clause 7: Overall safety lifecycle – IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems

IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems 1-7.15.2: Part 1, 7.15.2 Overall operation, maintenance and repair: requirements

The operation and maintenance plan from 7.7 and the operation, maintenance and repair procedures are put into effect, which includes running the procedures, following maintenance schedules, keeping documentation current, carrying out periodic functional safety audits and recording modifications. Chronological records of operation, repair and maintenance are kept, containing audit and test results; the time and cause of each demand on the safety systems in service with how they performed and faults found in routine maintenance; and modifications made to the EUC, the safety systems and the control system. The detail of these records may be set by product and sector standards.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 7:7 7 Operation, service and decommissioning

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Part 1, Clause 7: Overall safety lifecycle – IEC 61508:2010 - Functional Safety of E/E/PE Safety-related Systems

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.