GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6
Management system: documentation, improvement, training, subcontractors, suppliers and stock (FV-GFS 01 to 05) – GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6

GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6 FV-GFS 01.04: FV-GFS 01.04 Effective corrective actions are taken to address non-conformances detected during the self-assessments/internal audits.

Non-conformances found in the self-assessment or internal audit are closed out through documented corrective actions, and the changes they require are carried out. To comply, the producer must meet every applicable Major Must and no less than 95 percent of the applicable Minor Musts.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 3.4.3 3.4.3 Audit reports with objective evidence, agreed corrective actions verified, and a summary to management review

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Management system: documentation, improvement, training, subcontractors, suppliers and stock (FV-GFS 01 to 05) – GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.