FedRAMP High
PE - Physical and Environmental Protection

FedRAMP High PE-10: Emergency Shutoff. a. Provide the capability of shutting off power to [Assignment: organization-defined system or individual system components] in emergency situations; b. Place emergency shutoff switches or devices in [Assignment: organization-defined location by system

Emergency Shutoff. a. Provide the capability of shutting off power to [Assignment: organization-defined system or individual system components] in emergency situations; b. Place emergency shutoff switches or devices in [Assignment: organization-defined location by system

Other controls in PE - Physical and Environmental Protection

You are reading one control. How much of FedRAMP High have you already done?

FedRAMP High PE-10 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of FedRAMP High your existing evidence covers. Hold C5 (Germany) and 119 of 410 FedRAMP High controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 6 were rejected on the C5 (Germany) pair alone.

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.