FedRAMP High
PE - Physical and Environmental Protection

FedRAMP High PE-11: Emergency Power (PE-11)

Emergency Power. Provide an uninterruptible power supply to facilitate [Selection (one or more): an orderly shutdown of the system; transition of the system to long-term alternate power] in the event of a primary power

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 13 controls across 10 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

C5 (Germany) · 2 controls

  • C5-PS-02 Redundancy model
  • C5-PS-06 Protection against interruptions caused by power failures and other such risks
  • CFTC-SS-29 Recovery Plan Accounts for Essential Service Providers
  • CFTC-SS-6 Physical Security and Environmental Controls Category

ISO 22301:2019 · 1 control

  • 8.3.5 Implementation of solutions

ISO 27001:2022 · 1 control

  • 7.11 Supporting utilities

ISO 27002:2022 · 1 control

  • 7.11 Supporting utilities
  • PE-11 PE-11 Emergency Power
  • PE-11 PE-11 Emergency Power

SOC 2 · 1 control

  • SOC2-A1.2 A1.2 Environmental protection, backup and recovery infrastructure

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in PE - Physical and Environmental Protection

You are reading one control. How much of FedRAMP High have you already done?

FedRAMP High PE-11 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of FedRAMP High your existing evidence covers. Hold C5 (Germany) and 119 of 410 FedRAMP High controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 6 were rejected on the C5 (Germany) pair alone.

Query this from an agent

The graph holds this control, the 13 it maps to, and the evidence behind each claim, over MCP and REST.