NIST SP 800-53 Rev 5
PE - Physical and Environmental Protection

NIST SP 800-53 Rev 5 NIST800-PE-10: PE-10 Emergency Shutoff

a. Provide the capability of shutting off power to [Assignment: organization-defined system or individual system components] in emergency situations; b. Place emergency shutoff switches or devices in [Assignment: organization-defined location by system or system component] to facilitate access for authorized personnel; and c. Protect emergency power shutoff capability from unauthorized activation.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 15 controls across 10 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

SOC 2 · 4 controls

  • SOC2-A1.2 A1.2 Environmental protection, backup and recovery infrastructure
  • SOC2-A1.3 A1.3 Testing recovery plan procedures
  • SOC2-CC6.4 CC6.4 Restricting physical access to facilities and assets
  • SOC2-CC7.1 CC7.1 Detecting configuration changes and new vulnerabilities

ISO 27001:2022 · 2 controls

  • 7.11 Supporting utilities
  • 7.5 Protecting against physical and environmental threats

ISO 27002:2022 · 2 controls

  • 7.11 Supporting utilities
  • 7.5 Protecting against physical and environmental threats

C5 (Germany) · 1 control

  • C5-PS-06 Protection against interruptions caused by power failures and other such risks

FedRAMP High · 1 control

  • PE-10 Emergency Shutoff (PE-10)

FedRAMP Moderate · 1 control

  • PE-10 Emergency Shutoff (PE-10)
  • NIST-CSF-PR.IR-02 The organization's technology assets are protected from environmental threats
  • PE-10 PE-10 Emergency Shutoff
  • PE-10 PE-10 Emergency Shutoff

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in PE - Physical and Environmental Protection

You are reading one control. How much of NIST SP 800-53 Rev 5 have you already done?

NIST SP 800-53 Rev 5 NIST800-PE-10 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-53 Rev 5 your existing evidence covers. Hold ISO 27001:2022 and 163 of 1014 NIST SP 800-53 Rev 5 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 342 were rejected on the ISO 27001:2022 pair alone.

Query this from an agent

The graph holds this control, the 15 it maps to, and the evidence behind each claim, over MCP and REST.