Integrate the subsystems and components according to the integration planning, demonstrate the system's functionality and RAMS requirements, and install the integrated system into its higher-level system, the requirements applying to both tiers; for modifications keep a rollback capability and perform an impact analysis of the phase 5 architecture to confirm safe interaction and decide which earlier activities to repeat; test and analyse per the integration planning to show correct interaction as specified in the interface specifications and no unintended functions; show fulfilment of all SRACs of the subsystems and components, including code-of-practice conformance evidence, and derive and document inherited SRACs that the technical system itself cannot satisfy; initiate RAMS support arrangements (staff training, support procedures, spare parts, tools); derive SRACs from deviations. Deliverables: installation documentation, integration report, actions on failures and incompatibilities, support arrangements, updated hazard log, SRACs, safety case and plans.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.