EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS
EN 50126-1 clause 7: RAMS life cycle, phases 5 to 10 (implementation and demonstration) – EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS

EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS 50126-1:7.9: Phase 8: Integration

What does 50126-1:7.9 require?

Integrate the subsystems and components according to the integration planning, demonstrate the system's functionality and RAMS requirements, and install the integrated system into its higher-level system, the requirements applying to both tiers; for modifications keep a rollback capability and perform an impact analysis of the phase 5 architecture to confirm safe interaction and decide which earlier activities to repeat; test and analyse per the integration planning to show correct interaction as specified in the interface specifications and no unintended functions; show fulfilment of all SRACs of the subsystems and components, including code-of-practice conformance evidence, and derive and document inherited SRACs that the technical system itself cannot satisfy; initiate RAMS support arrangements (staff training, support procedures, spare parts, tools); derive SRACs from deviations. Deliverables: installation documentation, integration report, actions on failures and incompatibilities, support arrangements, updated hazard log, SRACs, safety case and plans.

Maintained by Gerard Blokdyk

Other controls in EN 50126-1 clause 7: RAMS life cycle, phases 5 to 10 (implementation and demonstration) – EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.