EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS 50126-1:7.11: Phase 10: System acceptance

What does 50126-1:7.11 require?

Judge whether the full set of subsystems, components, interfaces and SRACs with the overall RAMS requirements and accept it for putting into service (technical acceptance only; legal acceptance is outside the standard): all verification and validation tasks, specifically RAMS verification and validation and the safety case, are assessed against the defined risk acceptance criteria and the results recorded in an acceptance report confirming fitness for entry into service; the accepting entity evaluates the acceptance report against the acceptance criteria, whether the safety plan still applies, including any need for independent safety assessment, and the updated hazard log. Deliverables: ISA report if appropriate, endorsement of SRACs, acceptance report.

Maintained by Gerard Blokdyk

Other controls in EN 50126-1 clause 7: RAMS life cycle, phases 5 to 10 (implementation and demonstration) – EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.