EN 50126-1 clause 7: RAMS life cycle, phases 5 to 10 (implementation and demonstration) – EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS

EN 50126 / EN 50128 / EN 50129 - Railway Applications RAMS 50126-1:7.7.4: Phase 6 specific verification tasks

What does 50126-1:7.7.4 require?

In addition to 6.7.2, verification in phase 6 confirms that the design of subsystems and components meets the RAMS requirements, that their implementation complies with the design, that manufacturing will deliver subsystems and components with validated RAMS, and that the plans for every later life cycle activity agree with the system's RAMS requirements, based on analyses and tests.