RFF authorises items other than specified 3B, 3D and 3E semiconductor manufacturing items to Entity List entries that reference 740.26 (restricted fabrication facilities), not for operating or servicing specified SME there and not for producing advanced-node integrated circuits; it requires notification to BIS 45 days before shipment, notice within one business day of learning the end use has changed to advanced-node production, an installation report within 30 days, and an annual 1 February confirmation (for at least five years after last service) that installed equipment is not used for advanced-node production.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.