BSI PAS 1880:2020
Clause 9: AV control operation (AVCO) – BSI PAS 1880:2020

BSI PAS 1880:2020 9.2: 9.2 The AVCO and its interfaces

The control operation ought to hold primary responsibility for 9.1, supported by the AVPO and AVMO. It ought to receive the next movement from the AVPO as tactical or MRM directions and report its own status to the AVMO.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 4:6.4.3 6.4.3 System architectural design

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 9: AV control operation (AVCO) – BSI PAS 1880:2020

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.